// this opens social media lniks in a new tab // for a post slider, this lists date and category metas only to match the posts module

EPA and Army Corps Launch Major Cleanup at Wyckoff/Eagle Harbor Superfund Site

Apr 22, 2025 | Government, Technology

The EPA and U.S. Army Corps of Engineers have initiated construction of a reinforced concrete perimeter wall at the Wyckoff/Eagle Harbor Superfund site on Bainbridge Island, Washington. This project aims to:

  • Protect Puget Sound from ongoing contamination.
  • Facilitate the cleanup of contaminated groundwater, soil, and sediments.
  • Enable future redevelopment of the site into a public park with beach access.

The $63 million project commenced on April 18, 2025, and is scheduled for completion by April 2028. The new wall replaces a deteriorated steel sheet pile barrier to enhance environmental protection and community access.

Tags #Government, #Technology

Want to read more about this ? One of the original source articles from a trusted news source (not legacy media) is here:

Please consider our affiliate links. We use SiteGround Hosting.